Design name: ICU intelligent intensive care bed
Design time: 2020~2021
Design cycle: 8 months
Design content: design research, experience design, appearance design, CMF design, structure design
Intelligent upgrade, at the same time, the most priority and commonly used external systems are integrated, with the function of turning over. Through field research, the work flow of medical staff is optimized, the work intensity and medical accidents are reduced, the treatment efficiency is greatly improved, and the pain of patients is relieved.
本作品版权归 都蓬Dr.lee 所有,禁止匿名转载及个人使用,任何商业用途均需联系原作者。
新用户?创建账号
登录 重置密码请输入电子邮件以重置密码。
6666
Now the medical equipment is too strong
Hope everyone is healthy
Great!
On the high
very complicated