Starting from the material composition of the building facade, the principle of the frame structure, the finite element force analysis, the brilliant analysis, the failure analysis, the standardized structure design of the connecting piece, the process selection, the final overall simulation assembly and the cost budget, the products help the customer to effectively solve the building problem, successfully shorten the construction period of 3 months and save the budget of 10 million levels.
本作品版权归 品物杭州 所有,禁止匿名转载及个人使用,任何商业用途均需联系原作者。
新用户?创建账号
登录 重置密码请输入电子邮件以重置密码。
Ah, it wasn't designed by the Zaha team.
Professional
Really good stuff
This building is not simple.
this is not bad
Excellent